EasyManua.ls Logo

Altana BYK spectro2guide Series - 3 Getting Started; 3.1 System Diagram

Altana BYK spectro2guide Series
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 | Getting Started BYK-Gardner GmbH
20 spectro2guide Family 295 024 855 E 2405
3 Getting Started
Please observe following notes when you put the instrument into operation.
Assemble the entire system, consisting of instrument, docking station (option) and software.
Consult System Diagram [}20] for more information.
Place the instrument in the docking station and allow it to charge fully. The docking station
automatically charges the instrument and performs auto diagnosis. Consult Docking Sta-
tion [}21] and Charging Procedures [}22] for more information.
Press the Operate button in order to turn the instrument on.
Become familiar with the main menu for a quick navigation. Consult Using the Main Menu
[}22] for more information.
Press the displayed icons on the touch screen with your finger or the stylus in order to navi-
gate through the menu and perform functions.
Use the hand strap as protection against dropping the instrument.
Use the software “smart-chart” to tap the full potential of the instrument. Consult Software
Installation [}19] for more information.
3.1 System Diagram
3.1.1 System Setup for spectro2go
The entire system consists of instrument, power supply and software.
1. Connect instrument (1) via USB cable (2) with PC.
2. Download and install “smart-chart” software (3).
3. Turn instrument on by pressing the Operate button.
4. If instrument is to be charged, disconnect USB cable from PC.
5. Connect instrument (1) via USB cable (2) with power supply (4).

Table of Contents

Related product manuals