INSTALLATION
Rot iss erie ▪ O p er a tor’ s Ma n u al ▪ M N- 3940 4 ▪ Rev 1 ▪ 1/19
22
Installation Checklist
Installation of the oven is to be completed only by an authorized Alto-Shaam
service partner.
Place this form with the oven’s records.
Continued on next page
WARNING: Electric shock and arc flash hazard.
Use caution when measuring line voltage and line current.
Wear Personal Protective Equipment (PPE).
Installation date: Start up date:
Location name: Location address:
Contact name:
Contact phone number: Appliance model number:
Contact email: Appliance serial number:
Appliance rated voltage:
Oven physical condition Damaged
Record any damage
Yes No
Front of oven
Left side
Back of oven
Right side
Top and bottom/legs
Appliance visual inspection (outside) Yes No
Is there room to move the oven through hallways, doors, and paths to reach its
destination?
Is there adequate air flow and ventilation around the oven?
Is the water collection tray installed correctly?
Is the factory supplied cord in good condition?
Can the factory supplied cord reach the wall supply without the use of an
extension cord?
Is the oven level? Check front to back and side to side.
Appliance visual inspection (internal)
Loose/Damaged
Yes No
Check all wiring for any loose connections.
Check the overall system for any damage from shipping or installation.