INSTALLATION
Rot iss erie ▪ O p er a tor’ s Ma n u al ▪ M N- 3940 4 ▪ Rev 1 ▪ 1/19
32
How to Install the Grease Collection System
Before you begin The grease collection valve requires 6" (152mm) of vertical clearance. For
counter-top installations, the legs should be set to a height of 6" (152mm).
The handle of the grease collection valve must be parallel to the side of the oven.
Use enough Teflon® tape for a tight seal at the correct angle.
Procedure
To install the grease collection system, do the following.
Step Action
1. Unpack the grease collection valve assembly and the grease collection
container assembly.
2. Apply Teflon tape to the fittings on the grease collection hose a and valve
b.
3. Insert the valve into the elbow c.
Continued on next page