2 Introduction
Page 17
7. Login to the unit and follow the installation wizard option for easy installation.
a. Optimize the donor antenna performance (see software manual).
b. To select the channels for enhancement, choose between the
“Measurement Assisted Channel Assignment” or “Unassisted
Channel Assignment” from the Setup Wizard page (see software
manual).
c. Enter the pilot power to total power ratio of the donor Base Station.
d. Enter the desired output power in the downlink.
e. Enter the relative uplink gain and click the “Program” button.
f. Select the “Connectivity and Upload” button, to setup the modem (if
applicable) and to enter data in the other user fields (see software
manual).
g. Select the “Technician Setup” button (see software manual), to
change additional system settings, e.g. ICE, H.R. Filter, Diversity;
the “Technician Setup” is also accessible from the home page.
8. The Node M/C setup is complete.
9. Open the “Save Configuration to Laptop” menu for record keeping purposes.
10. Unplug the computer, close the Node M/C and tighten all screws.
) Note: To do a power cycle, disconnect the battery backup by pushing the
battery disconnect button on the EAC-board; see chapter
5.2.12 Battery Pack - Battery On/Off.