EasyManua.ls Logo

Applied Biosystems 7500 Fast User Manual

Applied Biosystems 7500 Fast
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Before Starting
the Installation
Unpacking and
Setting Up
the Instrument
Installing
the Software and
Powering On the
Instrument
Performing the
Regions of
Interest (ROI)
Calibration
Performing the
Background
Calibration and
Optical Calibration
Performing the
Pure Dye
Calibration
Verifying the
Instrument
Performance
Powering Off the
7300/7500/7500
Fast System
Applied Biosystems 7300/7500/7500 Fast
Real-Time PCR System
Installation and
Maintenance Guide

Table of Contents

Other manuals for Applied Biosystems 7500 Fast

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems 7500 Fast and is the answer not in the manual?

Applied Biosystems 7500 Fast Specifications

General IconGeneral
Instrument TypeReal-Time PCR System
Temperature Uniformity±0.5 °C
Heating Rate4.4 °C/sec
Ramp Rate (heating)4.4 °C/sec
Detection Channels5
Data AcquisitionContinuous
Thermal Cycler Block96-well
Sample Capacity96-well
Format96-well plate
Reaction Volume10–100 μL
Temperature Range4°C to 100°C
Temperature Accuracy±0.25 °C (35–100 °C)
Detection MethodFluorescence
Excitation SourceLED
Excitation Wavelengths470 nm, 520 nm, 580 nm, 623 nm
DyesSYBR Green, FAM, VIC, NED, ROX, Texas Red
Power Requirements100–240 VAC, 50/60 Hz

Summary

Safety and EMC Compliance Information

General Instrument Safety

Covers essential safety practices for instrument operation and handling.

Chemical Safety

Details procedures and precautions for handling chemicals safely.

Chemical Waste Safety

Guidelines for the proper and safe disposal of chemical waste.

Electrical Safety

Focuses on electrical hazards, including power supply and fuse safety.

Physical Hazard Safety

Addresses safety related to moving parts, power, and physical risks.

Chapter 1 Before Starting the Installation

Planning the Installation

Outlines the recommended workflow and time estimates for system installation.

Chapter 2 Unpacking and Setting Up the Instrument

Uncrating and Placing the 7300/7500/7500 Fast System

Detailed steps for safely unpacking and positioning the instrument.

Setting Up the 7300/7500/7500 Fast Instrument

Step-by-step guide for physically connecting and powering on the instrument.

Chapter 3 Installing the Software and Powering On the Instrument

Installing the SDS Software for the 7300/7500/7500 Fast System

Detailed procedure for installing the SDS software package.

Powering On the Instrument

Instructions for connecting the instrument and powering it on.

Performing the Instrument Function Test

Guide to running and interpreting the instrument's function test.

Chapter 4 Performing the Regions of Interest (ROI) Calibration

Preparing the ROI Calibration Plate

Steps for preparing the specific calibration plate for ROI.

Performing the ROI Calibration

Detailed procedure for executing the ROI calibration on the instrument.

Chapter 5 Performing the Background Calibration and Optical Calibration

Preparing the Background Calibration Plate

Instructions for preparing the background calibration plate.

Performing the Background Calibration

Procedure for running the background calibration.

Analyzing the Background Calibration Data

Guide to analyzing the data from the background calibration.

Performing the Optical Calibration for the 7500/7500 Fast System

Procedure for optical calibration specific to 7500/7500 Fast systems.

Chapter 6 Performing the Pure Dye Calibration

Chapter 7 Verifying the Instrument Performance

Troubleshooting

Solutions for issues encountered during RNase P plate runs.

Chapter 8 Powering Off the 7300/7500/7500 Fast System

Related product manuals