When the inverter is operated in 3-phase application, set up
inverter to be operated in specific phase.
Low DC cut-off voltage:
If battery power is only
power source available,
inverter will shut down.
If PV energy and battery
power are available,
inverter will charge
battery without AC
output.
If PV energy, battery
power and utility are all
available, inverter will
transfer to line mode
and provide output
power to loads.
If user-defined is selected in
program 5, this program can
be set up. Setting range is
from 42.0V to 48.0V.
Increment of each click is
0.1V. Low DC cut-off voltage
will be fixed to setting value
no matter what percentage of
load is connected.
Battery equalization disable
(default)
If “Flooded” or “User-Defined” is selected in program 05, this
program can be set up.