EasyManua.ls Logo

Argon 18 KRYPTON PRO 302A - Page 23

Argon 18 KRYPTON PRO 302A
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
KRYPTON PRO 302A 8. Stem Assembly
Stem Assembly - Step #1
After completion of the frame’s internal cable
routing (refer to section 6. or 7.), you will have
two cable / hose coming out of the HT:
• Rear brake hydraulic housing (BR)
• Di2 cable (EW)
Note: Make sure the cable and hose are not pulled
too much inside the frame. Leave some spare
length by slightly pushing back a few cm length
of cable / hose. This can help later to better adjust
the  t when changing the stack height or reach
length without having to rebleed the system.
BR
BR = Brake Hose
EW = Electronic Wire
EW

Related product manuals