EasyManuals Logo
Home>Arris>Multi-service Platforms>CHP Max5000

Arris CHP Max5000 User Manual

Arris CHP Max5000
267 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #172 background imageLoading...
Page #172 background image
7-6 CHP Max™ Headend Optics Platform Chassis, Controllers and Power Supplies Rev D
Monitoring — The steady state the management module enters when the shelf is
operating at its baseline configuration and configuration parameters change
infrequently or not at all. The application modules will be polled every 5 minutes.
Event Handling — State the management module enters when a module is removed
or installed in the CHP shelf. If a replacement module is not installed within the 4
hour “age out time” period, the management module will repeat the learning phase
to establish a new baseline.
Note The old module must be removed for a long enough period for the SMM-2 to
discover that there has been a change before a new one is discovered.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Arris CHP Max5000 and is the answer not in the manual?

Arris CHP Max5000 Specifications

General IconGeneral
BrandArris
ModelCHP Max5000
CategoryMulti-service Platforms
LanguageEnglish

Related product manuals