4.6 Finish Installation
4.6.1 Reinstall the Covers
1. Reinstall the inner cover by tightening the five screws to
the right torque.
2. Reinstall the maintenance cover by tightening the two
screws at the bottom of the charging station.
4.6.2 Distribution Box Wiring
Procedures above complete the power supply wiring to the
charging station. In order to complete the power supply wiring to
the distribution box, connect the wires as specified on the terminal
block.
If the charging station has the 485 communications cables and you
do not need them, coil them with electrical tape respectively. See
diagrams below for single-phase and three-phase wiring.