EasyManua.ls Logo

Badger Meter E Series - Actuating the Integrated Valve in BEACON; Scheduling Valve Actuation

Badger Meter E Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ACTUATING THE INTEGRATED VALVE IN BEACON
Best Practice
Actuate the valve through BEACON AMA. Make sure the ORION Cellular LTE-M or LTE-MS endpoint is connected to the meter
and activated.
MPORTANTI
Make sure to complete first time setup in BEACON Monitor. See "BEACON First Time Setup" on page 9 for details.
OTE:N To schedule multiple valves for actuation, see "Batch Actuation" on page 16.
Scheduling Actuation
In BEACON, you can schedule valve actuation for
the next endpoint communication time, or
a specific date
MPORTANTI
Before scheduling valve actuation, check BEACON to see the signal strength of the endpoint connected to the E-Series Ultrasonic Plus
meter. You should have good signal strength to close/open the valve (Figure 13).
Figure 13: Endpoint signal strength - Endpoint tab on expanded meter card
Actuating the Integrated Valve In BEACON
Page 13 August 2020 ESM-UM-02156-EN-02

Related product manuals