GrandPrix (GP-7 Series) Two-Post Lifts 12 P/N 5900209August 2018 — Rev. C2
Installation Checklist
Following are the steps needed to install a GP-7 Series lift; perform them in this order.
1. Review the installation safety rules.
2. Plan for electrical work.
3. Make sure you have the necessary tools.
4. Select the installation location.
5. Check the Clearances.
6. Unload and unpack the components.
7. Review the installation orientation.
8. Put down Chalk Line Guides for the posts.
9. Install the Post Straps.
10. Install the Powerside and Offside Posts.
11. Route the Lifting Cables.
12. Prepare the Top Trough.
13. Install the Top Trough.
14. Install the Power Unit (but don’t connect it to power yet).
15. Install the Safety Assemblies and the Safety Cable.
16. Install the Trip Stop Tube.
17. Install the Microswitch and the Microswitch Cable.
18. Install the Hydraulic Lines.
19. Connect the Lifting Cables.
20. Install the Safety Covers.
21. Install the Lift Arms.
22. Perform final leveling of the posts.
23. Connect the Power Unit.
24. Install the Power Disconnect Switch.
25. Install the Thermal Disconnect Switch.
26. Lubricate the lift.
27. Bleed the Hydraulic Cylinder.
28. Review the final checklist.