EasyManua.ls Logo

BendPak HD-12SS-B - Step 9;10: Power Unit and Hydraulic Hoses; Power Unit Mounting and Fluid Fill; Hydraulic Hose Connections

BendPak HD-12SS-B
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. After routing the cables double-check to make sure all are
properly positioned and remain within the grooves of ALL
sheaves. (See Fig. 8.3 & 8.4.)
STEP 9
( Power Unit Installation )
1. Mount the power unit to the mounting bracket using the
M10 hex bolts and nylon nuts then fill the reservoir with 12
quarts of 10-WT hydraulic oil or Dexron III automatic
transmission fluid. (See Fig. 9.1.)
STEP 10
( Routing Hydraulic Hoses )
1. Install the two 90-degree hydraulic fittings to the POWER
PORT and RETURN PORT of the power unit and connect
the hoses as described below. It will be necessary to
remove the shipping plugs from both ports prior to installing
the fittings. (See Fig. 10.1 & 10.2) (SPX Power Unit shown.
Verify port locations on Power Unit before connecting hoses.)
16
Fig. 9.1
Fig.8.2
Fig. 8.3
Fig. 10.1
Fig. 10.2
Fig. 8.4
Fig. 8.1