EasyManua.ls Logo

BendPak XPR-9F - Step 9: Installing the Safeties and Safety Cable

BendPak XPR-9F
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
STEP 9
(Installing the Safeties and Safety Cable)
1. Install Safety Weldments into each respective
Column. (See Figs 9.1 & 9. 2)
2. From the Offside Column insert the non looped end
of the Safety Cable through the hole located to the right of
the Offside Safety Weldment. (See Fig 9.3)
3. Route the Cable over the Safety Cable Pulley and take
it down to the Base Plate Pulley. (See Fig 9.4)
Fig 9.1
Fig 9.2
Fig 9.3
Fig 9.4.

Related product manuals