16
STEP 9
(Installing the Safeties and Safety Cable)
1. Install Safety Weldments into each respective
Column. (See Figs 9.1 & 9. 2)
2. From the Offside Column insert the non looped end
of the Safety Cable through the hole located to the right of
the Offside Safety Weldment. (See Fig 9.3)
3. Route the Cable over the Safety Cable Pulley and take
it down to the Base Plate Pulley. (See Fig 9.4)
Fig 9.1
Fig 9.2
Fig 9.3
Fig 9.4.