EasyManua.ls Logo

Better Packages 555e - Shear Blade Replacement

Better Packages 555e
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
Rev 9 2022
Maintenance & Repair Shear Blade Replacement
Part Numbers
FM20BXK – Blade Kit
Tools Needed
Philips head screwdriver
Flat head screwdriver
Vice grip pliers
Procedure
1. Unplug Machine
2. Remove the water bole, and tank assembly
3. Remove right side cover (5 Philips screws)
4. Remove le side cover (5 Philips screws) be
careful as the ribbons connecng the keypad can
be ripped easily.
5. Unplug keypad ribbons from controller board
6. Remove the tank shelf (gray plasc housing
boom front of machine) by pulling down on the
top while pressing in on the side retaining clips.
7. Remove the Bae Safety (2 or 3 Philips screws
depending on model)
8. Loosen the screw on the upper right side of
frame holding the retainer bracket
9. Li the retainer bracket
10. Remove the 2nd sha that holds the oiler
a. Use cauon as there is a spring under
tension
11. Remove the sha holding the heater and heat
plate in place
a. The heater can remain plugged in, place to
side of machine

Related product manuals