B - Table of contents
4.1.9) Placing cabinet side on the work top and pushing up against the stop or marking line 19
4.1.10) Setting hold down clamps to the material thickness 19
4.1.11) Drilling 19
4.1.12) Loosing hold down clamps 19
5 - Assembly 20
5.1 - Drilling hole groups 20
5.1.1) Required parts 20
5.1.2) Setting drill bit length 20
5.1.3) Setting drilling pattern 20
5.1.4) Inserting drill bits into the chuck 20
5.1.5) Checking drilling depth setting 20
5.1.6) Setting cam speed 20
5.1.7) Setting stop system 20
5.1.8) Setting swivel stops 20
5.1.9) Drilling hole groups 20
5.1.10) Placing cabinet side on the work top and pushing up against the stop or marking line 20
5.1.11) Setting hold down clamps to the material thickness 20
5.1.12) Drilling 20
5.1.13) Loosing hold down clamps 20
6 - Maintenance and service 21
6.1 - Maintenance 21
6.1.1) Maintenance 21
6.1.2) Damaged coupling 21
6.1.3) Replacing the operational status indicator 21
7 - Troubleshooting 22
7.1 - Error during drilling 22
7.2 - Fitting insertion error 25
7.3 - Function errors 25
8 - Appendix 27
8.1 – User-supplied work top 27
9 - Diagrams 28
9.1 - Electrical diagram 1x 230 V 50 Hz 28
9.2 - Electrical diagram 3x 230 V 50 Hz 29
9.3 - Electrical diagram 3x 400 V 50 Hz 30
9.4 - Pneumatic diagram 31