25
Electrical installation type
Capabilities Single phase feed Three phase feed Bi phase feed
Charging history X X X
Electric vehicle power
allocation
X (3) X (4) X
Domestic energy
charging
X X (5) X
(3) Installation case 2 specifically: power allocated to electric vehicle charging during power reduction
phases will not take into consideration the additionnal on-site domestic energy power generation.
(4) For a 3 phase feed house, the maximum power available for the Wallbox Pro is 1/3 of the total
installed power in the house.
(5) In case of three phase domestic energy local generation, only one phase of the domestic energy
will be taken into account.
Art der Elektroanlage
Funktionen
Einphasige
Einspeisung
Dreiphasige
Einspeisung
Zweiphasige
Einspeisung
Ladehistorie X X X
Energiezuteilung zum
Elektrofahrzeug
X (3) X (4) X (4)
Laden von selbst
erzeugtem Strom
(Eigenstrom)
X X (5) X (4)
(3) Spezifisch für Installationsszenario 2: In Stromreduzierungsphasen wird der zusätzlich vor Ort selbst
erzeugte Eigenstrom nicht für die dem Elektrofahrzeug zugeteilte Energie berücksichtigt.
(4) Für das dreiphasig gespeiste Haus wird die für die Wallbox Pro maximal verfügbare Energie
(Leistung) auf 1/3 der im Haus installierten Gesamtleistung.
(5) Bei dreiphasigem vor Ort selbst erzeugtem Eigenstrom wird nur eine Phase des Eigenstroms