EasyManua.ls Logo

Bomag BPR 70/70 D - Annual; 250-Hour Maintenance Tasks

Bomag BPR 70/70 D
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.9 Annually / every 250 operating hours
8.9.1
Replacing the V-belt
Protective equipment:
n
W
orking clothes
n
Safety shoes
n
Protective gloves
1.
Park the machine safely
Ä
Chapter 6.5 „Parking the machine
in secured condition“ on page 60.
2. Allow the engine to cool down.
3. Unscrew the V
-belt guard (1).
4. Unscrew the guard (1).
5. Unscrew the V
-belt pulley (1).
6. Replace the V
-belt (3).
7. If necessary
, reassemble the spacers (2) that may have been
removed.
8. Fasten the V
-belt pulley.
B-692-0175
1
Fig. 73
B-692-0187
1
Fig. 74
B-692-0188
1
2
3
Fig. 75
Maintenance – Annually / every 250 operating hours
BPR 70/70 D
82
Go to Discount-Equipment.com to order your parts

Table of Contents