EasyManua.ls Logo

Bosch Rexroth IndraDrive - Page 54

Bosch Rexroth IndraDrive
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
relatively synchronized to the master axis, the virtual master axis is continu‐
ously moved via the function block "MC_MoveVelocity".
The cyclic sequence of motion consists of two motion steps:
Motion step 1
Within
this motion step, material feed from the master axis position "0 de‐
grees" (master axis start position for material feed) to "180 de‐
grees" (master axis end position for material feed) takes place.
Motion step 2
The second motion step defines the punching range. Within this range,
material feed mustn't take place. The punching range reaches from the
master axis end position for material feed (180 degrees) to the master axis
start position for material feed (0 degrees).
Step 1 Material feed takes place from master axis position "0 increments" to
position "524288 increments"
Step 2 Punching takes place within this range
Fig.7-2: Sequence of Motion
Bosch Rexroth AG DOK-INDRV*-MLD-APPLI**-AW02-EN-P
Rexroth IndraDrive Rexroth IndraMotion MLD Application Examples
52/97
Synchronous Multi-Axis Motion With Virtual Master Axis
LSA Control S.L. www.lsa-control.com comercial@lsa-control.com (+34) 960 62 43 01

Table of Contents

Other manuals for Bosch Rexroth IndraDrive

Related product manuals