Facility Requirements
Before installing the device, be sure that the following facility requirements are met.
Table 6: Facility Requirements
Type Requirements
Electrical
•
An adequate supply circuit, line fusing, and wire size, as specified by the electrical rating on the switch
nameplate.
•
A circuit that is protected by a circuit breaker and grounded in accordance with local electrical codes.
See the Technical Specifications section for power supply specifications.
Thermal
•
A minimum airflow of 79.8 cubic meters/hour (47 cubic feet/minute) available in the immediate vicinity of
the switch. Although this airflow may exceed the airflow maximum that is listed in the device technical
specifications, the additional airflow is recommended to pressurize the inlet (cool isle) side of rack
installations relative to the exhaust side to minimize recirculation of hot air back to the inlet side.
•
Ambient air temperature not exceeding 40°C (104°F) while the switch is operating.
Rack (when rack-
mounted)
•
One rack unit (1U) in a 48.3 cm (19 in.) rack.
•
All equipment in the rack grounded through a reliable branch circuit connection.
•
The additional weight of the switch not to exceed the weight limits of the rack.
•
Rack secured to ensure stability if there is unexpected movement.
Quick Installation Checklist
The following checklists provide a high-level overview of the basic installation process from the planning stage to the point
where the device comes online and is ready to be deployed. Completing all the tasks in the suggested order ensures
successful installation. Print these checklists and take them to the installation site.
Preinstallation Tasks
Review all installation requirements ahead of time as part of your site preparation. Careful planning and site preparation
ensure seamless installation, especially when installing multiple devices.
Table 7: Installation Prerequisites
Task Task Details or Additional Information Completed
Unpack the device. Take an inventory of the hardware components included in your shipment. See
Shipping Carton Contents.
Gather the necessary components and
required tools.
Review the time and items that are required at the beginning of each chapter to
ensure that you have gathered all the necessary components that are required
for the following installation tasks:
•
Mounting the Device
•
Installing Transceivers and Cables
•
Power Supply and Fan Assemblies
Review the safety precautions. See Safety Precautions. For the translation of these messages, see Cautions
and Danger Notices.
Plan the installation. Decide whether you want to install the unit on a flat surface or in a rack. For
rack installation, obtain the appropriate rack mount kit. See Mounting the
Device.