EasyManua.ls Logo

Broadcom Brocade G620 - Installing an SFP+ Transceiver

Broadcom Brocade G620
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53-1003990-22 Installation Guide
Brocade
®
G620 Switch Hardware Installation Guide
Installing an SFP+ Transceiver
The device supports only transceivers that are qualified for Brocade products. For current information on qualified
transceivers supported by this device, refer to the Brocade Transceiver Support Matrix and the Brocade Transceiver
Modules webpage on www.broadcom.com. If you use an unqualified transceiver, the switchshow command output
shows the port in a Mod_Inv state. The issue is also logged in the system error log.
Perform the following steps to insert an SFP+ transceiver.
NOTE
Always use the pull tab to insert or remove a transceiver, because the SFP might be hot.
You might find it easier to insert the cables into the transceiver first and then install the transceiver.
1. Use the pull tab on the SFP+ transceiver to help push the transceiver into the port.
Transceivers are keyed so that they can be inserted only with the correct orientation. If a transceiver does not slide in
easily, ensure that it is correctly oriented. Push the correctly oriented transceiver into the port until it is firmly seated
and the latching mechanism clicks.
NOTE
Each SFP+ transceiver has a 10-pad gold-plated PCB-edge connector on the bottom. The correct position
to insert an SFP+ transceiver into the upper row of ports is with the gold edge down. The correct position to
insert an SFP+ transceiver into the lower row of ports is with the gold edge up.
Figure 28: Installing SFP+ Transceivers
1. Pull Tab of Transceiver in Upper Row
2. Pull Tab of Transceiver in Lower Row
53-1003990-22
55

Table of Contents

Related product manuals