53-1003990-22 Installation Guide
Brocade
®
G620 Switch Hardware Installation Guide
Installing the Device in the Rack
Perform the following steps to install the device in the rack:
1. Position the device in the rack, providing temporary support under the device until the rail kit is secured to the rack.
2. Attach the right front bracket to the right rear rack post using two 10-32 x 5/8-in. panhead screws and two retainer
nuts. Use the upper and lower holes in the bracket.
3. Tighten all 10-32 x 5/8-in. screws to a torque of 29 cm-kg (25 in.-lb).
Figure 13: Positioning the Device in the Rack
1. Screws, 10-32 x 5/8-in. Panhead Phillips
2. Retainer Nuts, 10-32
53-1003990-22
31