X7-4-Install-IG100 Installation Guide
Brocade
®
X7-4 Director Hardware Installation Guide
Installing the Device in the Rack
1. Ensure that the door is removed from the port side of the device if it is installed. See the procedures for removing and
replacing the device door in this guide.
2. Ensure the chassis can be oriented so that the nonport side has access to intake air (cool).
3. If applicable, lock the wheels of the lift.
4. Use a lift to raise the chassis to the correct level.
5. Gently slide the chassis onto the rack, ensuring that it remains supported during the transfer. See the following figure.
Figure 25: Installing a Chassis into the Equipment Rack
X7-4-Install-IG100
54