3. INSTALLATION OF THE EQUIPMENT
3.1- General considerations
Place the chlorination cell in the highest position possible of the purification circuit and always after the
filter.
If possible, it is recommended to install the cell with a by-pass system with its corresponding shut-off
valves. This is to facilitate maintenance of the cell.
Do not place the REDOX probe (OPTIONAL) near the chlorinator cell, as faulty readings could be made
owing to the proximity of the electrolysis circuit. Always try and ensure that the filter is between both
and that there is at least half a metre of water flow between the probe and the chlorination cell.
The REDOX probe should be installed after the filter, but if with this layout it is not possible to keep a
minimum distance from the cell, it should be assembled before the filter. In this case more frequent
maintenance of the probe is required (see paragraph 5.2 below in "Maintenance").
A good earth connection is essential. Use a differential relay with max. 30mA of sensitivity.
If a good quality earth connection is not available, place an earth connection kit between the electrolysis
cell and the redox probe. OPTIONAL KIT