EasyManua.ls Logo

Bucher C-LRV 700 - 4.3 Commissioning and Settings; 4.3.2 Checking Minimum Static Pressure

Default Icon
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CLRV lift control valve Installation and commissioning
52/92
300−I−9010212−E−10/08.08
4.3 Commissioning/settings
4.3.1 Checking the test numbers
S The valve test number is stamped on the body (below the manual
emergency−lowering valve) 1.2.2.
S The C−DELCON test number is on a label on the connector 1.4.
Important: always quote the test number when making enquiries. This
makes it easier for the factory to help you!
Important: the test numbers on the C−DELCON and the valve must be
the same to avoid the need for resetting.
4.3.2 Checking the minimum static pressure
To check the minimum static pressure (with empty car):
1. Open pressure gauge shut−off valve
2. Read the minimum static pressure on the pressure gauge
3. Compare minimum static pressure on rating plate with actual
minimum static system pressure on the pressure gauge
I Page 9, Section 1.2.1, Item (4)
4. If the difference is more than 5bar, the maximum pressure setting
must be increased by the amount of the difference ( 4.3.4)
I Bypass pressure too high: car travels past landing
I Bypass pressure too low: UP starting jolt
The minimum static pressure shown is correct
Important: if the difference is more than > 10bar, please contact
Customer Services.

Table of Contents

Related product manuals