BÜCHI Labortechnik AG Installation | 5
Operation Manual SyncorePlus 21/56
NOTICE
Risk of property damage and diminished performance due to use of un-
suitable power cables.
The power supply cables supplied with the product by BUCHI precisely match the re-
quirements of the device. If other power cables that do not meet those requirements
are used, the device may be damaged and/or its performance diminished.
u Use only the power supply cables supplied with the product or ordered separately
from BUCHI.
u If using any other power supply cables, make sure that they match the specifica-
tions on the type plate.
u Make sure that all connected devices are earthed.
u Plug the power cable into the connection on the instrument. See Chapter3.2
"Configuration", page14
u Plug the mains plug into the mains outlet socket.
5.4 Securing against earthquakes
NOTE
4 Eye screw M10 x 10.
4 Screw-in depth 10 mm.
NOTE
Choose the tap hole according to your installation.
Position tap hole see Chapter3.2 "Configuration", page14
u Attach the eye screws to the instrument.
u Attach the instrument to a fixed point using a
strong cord or a wire.
5.5 Connecting the instrument to the control system
NOTE
Using the control system. See operation manual "Interface I-300 Pro ".
5.6 Installing the condenser
NOTE
Choose the tap hole according to your installation.
Position tap hole see Chapter3.2 "Configuration", page14