EasyManua.ls Logo

Buchi SyncorePlus - Preparing a SPE Configuration

Buchi SyncorePlus
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 | Preparing the instrument for a configuration BÜCHI Labortechnik AG
32/56 Operation Manual SyncorePlus
6.3 Preparing a SPE configuration
u Make sure that the surface of the heater base
is clean.
u Put the rack on the heater base.
u Make sure that there are no spaces between
rack and heater base.
u Secure the rack in place with the screws on
both sides.
u Fill water into the rack.

Table of Contents

Related product manuals