6 | Preparing the instrument for a configuration BÜCHI Labortechnik AG
32/56 Operation Manual SyncorePlus
6.3 Preparing a SPE configuration
u Make sure that the surface of the heater base
is clean.
u Put the rack on the heater base.
u Make sure that there are no spaces between
rack and heater base.
u Secure the rack in place with the screws on
both sides.
u Fill water into the rack.