BÜCHI Labortechnik AG Preparing the instrument for a configuration | 6
Operation Manual SyncorePlus 31/56
u Connect the heater cover to the instrument.
u Put the sample tubes in the rack.
u Close the protective cover.
u Put the heater cover on the rack.
NOTICE!Do not tighten the knurl nuts too
much.
u Tighten the knurl nuts with your hand.