6 | Preparing the instrument for a configuration BÜCHI Labortechnik AG
28/56 Operation Manual SyncorePlus
u Attach the vacuum hose to the heater cover.
u Put the heater cover on the instrument.
u Connect the heater cover to the instrument.
u If using a rack with 24 or more positions, place
a spring in each hole.
u Put the sample tubes in the rack.
u Close the protective cover.