2003 Buell XB9S: Chassis 2-77
HOME
SPROCKET COVER 2.31
REMOVAL
1. See Figure 2-103. Remove back right chin fairing fasten-
ers.
NOTE
Must remove two chin fairing fasteners for sprocket cover
access.
2. See Figure 2-104. Remove sprocket cover fasteners and
washers (1).
INSTALLATION
1. See Figure 2-104. Position sprocket cover (2) over front
belt guard (3) and front sprocket.
2. Install sprocket cover (2) using LOCTITE 222 on rear
sprocket cover fastener (1) and tighten all fasteners and
washers (1) to 12-36 in-lbs (1-4 Nm).
3. Install chin fairing. See 2.34 CHIN FAIRING.
Figure 2-103. Chin Fairing Assembly
Figure 2-104. Sprocket Cover
b0943x2x
1. Sprocket cover fastener and washers
2. Sprocket cover
3. Front belt guard
1
2
1
3