3-28 2003 Buell XB9S: Engine
HOME
42. See Figure 3-32. If the crankcases are being separated it
will be necessary to remove rear isolator assembly by
removing the forward two fasteners first and then the two
rear fasteners (re-install with new fasteners).
43. See Figure 3-33. Place a block of wood between rear
isolator mount on main frame and swingarm/oil tank.
44. Route a ratcheting tie down through the swingarm bear-
ings, up over the main frame, through the top stabilizer
area, back down to the ratchet mechanism and secure
swingarm to main frame.
NOTE
See Figure 3-34. This allows the vehicle to remain together
as a rolling chassis and to be removed from the lift and stored
if necessary.
45. Remove support from under swingarm/oil tank.
46. Remove overhead support.
Figure 3-32. Rear Isolator and Mounting Hardware
Figure 3-33. Securing Vehicle for Relocation (Typical)
8723
8728
Figure 3-34. Rolling Chassis (Typical)
8726