EasyManua.ls Logo

C2Dx T/PUMP TP700 - Current Leakage Check

C2Dx T/PUMP TP700
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Functional checks (Continued)
Current leakage check
Check the current leakage at this point with the unit full and connected to a pad.
Procedure:
1. Connect the pump to the Mul-T-Pad
®
Temperature Therapy Pad.
2. Straighten the pad and hoses.
3. Open the hose clamps.
4. Open the ll cap on top of the pump.
5. Fill with room temperature water to the Heating water line. Close the ll cap on the top of the pump.
6. Plug the pump into a properly grounded Hospital Grade receptacle.
Notes: The pump performs a self test of the lights and audible alarm, with a light pattern and a short audible beep.
The pump goes to Standby mode with only the Standby light on.
7. Press the On/Standby button.
8. Using the Current leakage meter, measure all combinations of heater in the on and off states by pressing the
On/Standby button.
Notes
Access to ground for current leakage testing is available through the hole where (See Figure 4 Access to ground
on page 20) the hose connects to the pump.
The highest reading should be less than 100μA.
Figure 4: Access to ground
9. Record the highest reading.
10. Disconnect the current leakage meter.
101176 Rev 1
Preventive maintenance
20 c2dx.com

Related product manuals