EasyManua.ls Logo

CEM SMART 6 - Page 58

CEM SMART 6
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54 Data Management
batches or technician shifts.
• Selecting Samples allows the user to select the last samples using that method. This can be helpful for
conrming the statistics on specic projects or validations.
5. After the data range has been set, select the Search icon to access the statistical analyses. The SMART 6 will
include the Average, Minimum result, Maximum Result, Results Range, and Standard Deviation. It will also list
all samples being used to compile the statistical analysis.
6. An SPC (Statistical Process Control) chart can also be created for the data that will be included. Lower and up-
per limits can be set in order to ensure data is between or outside the range of a certain product specication.

Related product manuals