EasyManua.ls Logo

CENTURION SYSTEMS D20 SMART - Table of Contents

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 3 www.centsys.com
Contents
1. INTRODUCTION
1.1. Important Safety Information
1.2. Lightning Protection
1.3. Theft Protection
2. SPECIFICATIONS
2.1. Physical Dimensions
2.2. Technical Specications
3. PRODUCT IDENTIFICATION
4. REQUIRED TOOLS AND EQUIPMENT
5. NEW SITE INSTALLATION PREPARATION
5.1. General Considerations for the Installation
5.2. Endstops
5.3. Guide-rollers and Anti-lift Brackets
5.4. Starting and Running Forces
5.5. Cabling Requirements
6. LUBRICATION
7. OPERATOR INSTALLATION
7.1. New Site Installations
7.1.1. Locating an Initial Reference Point
7.1.2. Minimum Clearances
7.1.3. Locate the Operator's Position
7.1.4. Foundation Plate Installation
7.2. Retro-t Installations (Existing Sites)
7.3. Conduit and Cable Length
7.4. Preparing the Operator for Installation
7.4.1. Removing the Charger
7.4.2. Removing the Gearbox Trim and Battery Tray assembly
7.4.3. Removing the Control Card
7.5. Mounting the Gearbox
7.6. Routing the Cables
7.7. Manual Override
Page 5
Page 6
Page 8
Page 8
Page 9
Page 9
Page 9
Page 11
Page 12
Page 13
Page 13
Page 14
Page 14
Page 15
Page 16
Page 17
Page 18
Page 18
Page 18
Page 19
Page 20
Page 24
Page 25
Page 26
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32

Table of Contents

Related product manuals