- 4 -
5. Installation and start-up
Installation and start-up of a measuring system is best performed in the order stated
below. Please note that the different steps may vary in meaning, depending on the
particular sensor and the number of sensors that are to be connected to the control box.
Documentation of installation procedures and start-up can be done directly on this paper
or on a copy of the paper.
Steps Section Performed Note
date sign.
Unpacking the BB2
control box
6
Unpacking the sensor Refer to the
sensor manual
Mounting of BB2 control
box
7
Mounting of sensor Refer to the
sensor manual
Electrical installation of
BB2 control box
8 - 12
Electrical installation of
sensor
Refer to the
sensor manual
Using BB2 13 - 15
Settings and Calibration
of sensor
Refer to the
sensor manual