Tecma Toilet Installation - RK/RJ (Continued)
With Optional Macerator Pump
Figure 3-113. Overboard Discharge
Figure 3-109. Holding Tank Pump Out Hoses
Figure 3-110 Hose From Holding Tank to Pump Out Station
Figure 3-111. Bottom Thru Hull Fitting
Figure 3-112. Macerator Pump and Shut Off Valve
To Transom
Pump-out
Station
To Transom
Pump-out
Station
To Macerator
and Seacock
From Macerator
to Seacock
From Seacock to
Thru-hull Fitting
3-58 3-58
Systems