Standard unit test
Apart from the process phases of the freeze-drying process ("Freezing",
"Warm-up", "Main drying", and "Final drying") and the operating mode
"Defrosting", the button "Unit Test" is also available. This button opens a
selection of a test with fixed parameters. After consultation with the
manufacturer, this test can be performed in order to check the functionality
and processes of the freeze-dryer.
Fig. 32: Dialog box "Standard unit test"
Performance test (1)
The performance test is used to determine the following performance
parameters:
vacuum decrease rate
final vacuum
minimum ice condenser temperature
shelf cooling rate
minimum shelf temperature
shelf heating rate
NOTE
Prior to performing a test, ensure that the chamber is dry and unloaded
and that the ice condenser is defrosted.
Procedure:
In the main window "Manual", select the button "Operating mode:
select/start" "Standard unit test".
Select "Performance test" and start the test via the "Run" button.
The test will be performed. The parameters will be measured at defined
points of time, evaluated, and displayed in a dialog box in the form of a
table. The result will be indicated by way of a dialog box.
If the freeze-dryer is equipped with the LPCplus SCADA software, the
results will be documented in the event list.