EasyManua.ls Logo

Chroma 19071 - Page 46

Chroma 19071
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HIPOT Tester 19071/19072/19073 Users Manual
2-22
(2) Set END OF STEPto ON
Timing diagram take an example by two test steps
Time
Limit
Description
T1 > 20mS
The time of external trigger signal (/START) to be remained
which needs larger than 20mS.
T2
< 200mS
The time of external trigger signal /START to /UNDER TEST
signal to be cleared, it will be smaller than 200mS. The
previous STEP test result /PASS
signal status has been cleared
in advance.
< 300mS
The time of external trigger signal /START to /UNDER TEST
signal to be cleared, it will be smaller than 300mS. The
previous STEP test result /PASS signal status hasnt been
cleared in advance.
T3
-
Test needed time of various test steps.
T4
> 5mS
/Pass signal sent larger than 5mS, /UNDER TEST signal is end.
T5 -
The equipment used time as testing, the signal is simultaneous
with Danger lamp on panel.
T6 >10mS
When the setting of END OF STEPis ON, /UNDER TEST
signal OFF time is larger than 10mS between STEP and STEP.
/START
T1
/UNDER TEST
T2
/FAIL
T3
/PASS
T4
T3
STEP 1
STEP 2
T6
T5

Table of Contents

Other manuals for Chroma 19071

Related product manuals