14
1. SETUP:
A) Set Sealant Flow Control to “ 9 ”
B) Set Control Panel rotary switch to “ RUN ”.
2. START ENGINE:
A) Turn key on engine control to “ 1”
B) Allow 3-5 seconds to heat glow plugs
C) Turn key to “ 2”
Melter Start Up
Load Sealant into Empty Tank
All material must be clean. Keep all foreign matter out
of melting tank.
1) Open the material door (a) and place the block of
material (b) on the open door against the holder (c).
2) Push door to the closed position.
TO AVOID CONTACT WITH HOT SEALANT DO NOT
DROP MATERIAL INTO THE MELTER WITH DOOR
OPEN.
LOADING OPERATOR MUST WEAR PROTECTIVE
CLOATHING COVERED ON PAGE 4.
LOAD MATERIAL FROM GROUND ONLY. NEVER CLIMB
ON THE TRAILER TO LOAD.
(a)
(b)
(c)
WARNING