OPERATING INSTRUCTIONS
41
CHAPTER 3: OPERATION
START-UP INSTRUCTION SUMMARY (EZT-570S
CONTROLLER)
The control section, illustrated in Figure 4-1, is composed of a CSZ EZT-570S
Controller. Specifications for the Controller may be found in the EZT-570S
User's manuals, located on the digital media included in this binder.
Figure 3-1: CSZ EZT 570S Controller
NOTE
Humidity performance will
be affected if live loads are
placed in the chamber
when trying to achieve
certain humidity levels.
When running at high
humidity levels for an
extended period of time,
the tip of the humidity
sensor can become
saturated, resulting in
erroneous readings. To
correct this condition, it is
recommended that the tip
be dried out by turning the
humidity system off and
raising the temperature to
250°F (121.1°C) high temp
for 10 minutes. The sensor
accuracy will be restored
by evaporating the water
out of the porous cover
over the sensing element.
NOTE
Any changes to the CSZ
configurations programmed
in the temperature
controller or safety limit
without prior authorization
by CSZ could void warranty.
Related issues and costs
associated from the
changing of these
configuration settings could
be deemed customers
responsibility. Call factory
prior to changing these
configurations.
NOTE
Note: CSZ is continuously upgrading the components used in its equipment.
Consequently, the physical appearance of certain components may vary from that
shown.
EZT-570S Screen
USB Port

Table of Contents