MAINTENANCE WITH Q & A
64
INSPECTION SCHEDULE
In the day-to-day operation of this equipment, you will become aware of certain
levels of noise, vibration, temperature and pressure. If you encounter any
significant changes in these levels, investigate them immediately.
An inspection program should be developed for this equipment. To assist in
your development of this program, Cincinnati Sub-Zero has prepared a list of
routine inspections. While this list is not all inclusive, it will serve as a good base
on which to build your own custom program. The establishment of such a
program will add significantly to the life of the equipment and will reduce
unscheduled down time on the equipment.
Table 5-2: Inspection Schedule
1. Interior & Exterior Cleaning
2. Fluid Levels (If Applicable)
3. Gas Monitor (Optional Equipment) Water Filter
4. R-404A Charge (If Applicable)
5. R-410A Charge (If Applicable)
6. R-508B Stand-By Pressure (If Applicable)
7. R-508B Stand-By Pressure (If Applicable)
8. R-23 Stand-By Pressure (If Applicable)
10. Humidity Demineralizer Filter (Optional Equipment)
11. Air Cooled Condenser (If Applicable)
14. Check GFCI Receptacle (If Applicable)
16. Oil Pressure (Semi-Hermetic Compressors Only)
17. Humidity Sensor (If Applicable)
18. Product High/Low Limit
20. Water Cooled Condenser (If Applicable)
21. Chamber Controller Calibration/Verification
22. Diaphragm, Air Compressor (Atomizer, Optional Equipment)
scheduled inspections
require maintenance,
contact a qualified service
technician or CSZ's Service
department.