EasyManua.ls Logo

Cino eC - First Power On (Continued); Cleaning Cycles

Cino eC
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
08.04
08.05.
repeat the operation for some times to rinse the whole water circuit
of the machine; during the wash cycles, the display shows:
power off the vending machine by means of the service key;
arrange it in its support (see 05.14.); power off the main switch at
the back of the machine (see 05.08.);
prepare a chlorine-based anti-bacterial sanitising solution by
observing the instructions supplied with the product; remove and
immerse the following into the solution: the product canisters you
have disassembled, the trays of mixers, their fans and the silicone
tubes intended to dispense products; the time necessary to sanitise
is specified by the anti-bacterial product package; at the end,
remove all the parts you have sanitised from the solution, dry them
carefully by using clean cloths and reassemble them into the
machine; rotate the baffles of the product slides of instant canisters
to close them and load the canisters with reference to the machine
configuration (see 04.) and to the canister labels; fill in the coffee
hopper (in the E machine) with coffee beans; close the canisters
and the coffee hopper with
their upper covers;
rotate the baffles of the product slides (see 05.22.) to open them
and (in the E machine) insert the orange blade to the bottom
intended to close the coffee hopper;
(see also 12.);
to clean and treat food products properly, refer to the content of
the following Internet address:
http://eur-lex.europa.eu//
regulation 2004/852/EC of 29/04/2004
lower down the cover and close the door by means of the lock key
(see 05.05.) and place it in a safe place;
power on the machine by means of the main switch; the display
will show in sequence following messages:
till the water temperature of the pressure boiler or the boiler is
suitable for the value set in the memory (by default);
at the end of this phase intended to heat water in the pressure
boiler, the vending machine is ready to dispense on a free basis
and the display will alternatively show some stand-by messages:
cino eC
Espresso
rheavendors
cino eC
Espresso
cleaning N
switching on…
please wait
wait
temperature
cino eC by
MAN1010105 rel. 03 dated 12.02.2014 page no. 26 of 50 page
www.rheavendors.com tel: 0039 02 966 551 fax: 0039 02 96 55 086 e mail: rheavendors@rheavendors.com
rheavendors group's sole property

Related product manuals