Verifying the Package Contents 15
Verifying the Switch Operation 15
Switch Installation 16
Rack-Mount Installation 16
Attach Brackets for 19-Inch Racks 17
Attach Brackets for 19-Inch Racks for IP-30 Compliance (Optional) 18
Attach Brackets for 23-Inch Racks 20
Attach Brackets for ETSI Racks 21
Rack-Mount the Switch 22
Installing Multiple Switches in the Rack 24
Wall-Mount Installation 25
Attach Wall-Mount Brackets 27
Wall-Mount the Switch 28
SFP Installation 29
SFP Installation Considerations and Guidelines 30
Install Fiber Optic SFP Modules 31
Install 100/1000BASE-T SFP Modules 31
Guidance for Connecting to SFP Modules 33
Connect to a Fiber Optic SFP Module 33
Connect to a 1000BASE-T SFP Module 34
Remove SFP Modules 34
Replace the SD Flash Memory Card 35
Connecting Devices to the Ethernet Ports 35
Power Supply Installation 37
CHAPTER 3
Power Supply Installation 37
Power Supply Modules 37
Power Supply Installation Guidelines 38
Installing a Power-Supply Module 39
Required Tools and Equipment 39
Ground the Switch 40
Install the Power-Supply Module in the Switch 42
Wire the Power Source 43
Remove the Power-Supply Module 46
Cisco Catalyst IE9300 Rugged Series Switch Hardware Installation Guide
vi
Contents