EasyManuals Logo

Cisco VG248 - Gateway User Manual

Cisco VG248 - Gateway
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #97 background imageLoading...
Page #97 background image
5-33
Cisco VG248 Analog Phone Gateway Software Configuration Guide
OL-1209-02
Chapter 5 Integrating Cisco CallManager with Voice Mail Systems Using SMDI
Verifying and Troubleshooting the SMDI Connection
SMDI Required Async 1
link has gone
down
Certain SMDI configuration
items require the use of one
or both Async ports. For
example, if the Number of
SMDI ports is greater than
0, Async 1 must be active. If
Forward MWIs to Async 2
is enabled, Async 2 should
be up.
If a required Async port either fails to
come up when the box starts up or
goes down at some point during its
operation, the VG248 generates these
messages.
Check the cables on the Async 1 and
Async 2 ports to verify that they are
still connected.
SMDI Required Async 1
link has not come
up
SMDI Required Async 2
link has gone
down
SMDI Required Async 2
link has not come
up
SMDI Async 1 now
active
These messages indicate
that the VG248 has detected
that it is now connected to
another system via the
indicated Async port, or the
connection has gone down.
These messages are informational
only.
SMDI Async 2 now
active
SMDI Async 1 now
inactive
SMDI Async 2 now
inactive
Table 5-5 SMDI Errors and Warnings Explanation (continued)
System Message Explanation Action

Table of Contents

Other manuals for Cisco VG248 - Gateway

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco VG248 - Gateway and is the answer not in the manual?

Cisco VG248 - Gateway Specifications

General IconGeneral
BrandCisco
ModelVG248 - Gateway
CategoryGateway
LanguageEnglish

Related product manuals