Page 6 CI Man u al
OEM Cycle Sequence
OEM Cycle Sequence instructions allows the OEM to set the order of
the cycle. The OEM Softener System Setup or the OEM Filter System
Setup allow the OEM to set how long cycles will last. The OEM may
choose up to 9 cycles in any order.
END must be used as the last cycle option. The SERVICE cycle
should only be used in brine prefi ll applications.
The following is an example of how to set a valve so that when regeneration is initiated BACKWASH occurs fi rst, dn BRINE
occurs second, RINSE occurs third, and FILL occurs fourth.
STEP 1CS
Step 1CS – Press NEXT and ▼ simultaneously for 3 seconds and release. Then press NEXT and ▼
simultaneously for 3 seconds and release. If screen in Step 2CS does not appear in 5 seconds the lock
on the valve is activated. To unlock press ▼, NEXT, ▲, and SET CLOCK in sequence, then press
NEXT and ▼ simultaneously for 3 seconds and release. Then press NEXT and ▼ simultaneously for
3 seconds and release.
Step 2CS – Use ▲ or ▼ to select 1.0 for WS1 valve, 1.25 for WS1.25 valve, 1.5 for WS1.5 valve, 2.0
for WS2 or 1.0 for a twin valve.
STEP 2CS
Step 3CS – When 1.5 or 2.0 is selected, an additional screen will appear.
It is used to select which size fl ow meter is to be used with the valve, 1.5”,
2.0” or 3.0”. Variable meter pulses of 0.1-150.0 PPL can also be selected.
Press NEXT to go to Step 4CS. Press REGEN to return to previous step.
STEP 3CS
Cycle Options
BACKWASH DN BRINE FILL
END
RINSE UP BRINE
SOFTENING
OR FILTERING