Page 8 WS1CS & WS1.25CS Manual
OEM General Instructions
The control valve offers multiple procedures that allow the valve to be modi ed to suit the needs of the installation. These
procedures are:
OEM Softener Setup
OEM Filter Setup
Installer Displays & Settings
User Displays & Settings
• Diagnostics
• Valve History
These procedures can be accessed in any order. Details on each of the procedures are provided on the following pages.
At the discretion of the manufacturer, the eld technician can access all settings. To “lock out” access to diagnostic and valve
history displays and modi cations to settings except hardness, day override, time of regeneration and time of day by anyone but
the manufacturer, press , NEXT, , and SET CLOCK in sequence after settings are made. To “unlock”, so other displays can be
viewed and changes can be made, press , NEXT, , and SET CLOCK in sequence.
When in operation normal user displays such as time of day, gallons remaining or days remaining before regeneration are shown.
When stepping through a procedure, if no buttons are pressed within ve minutes the display returns to a normal user display. Any
changes made prior to the ve minute time out are incorporated. The one exception is current ow rate display under the diagnostic
procedure. The current ow rate display has a 30 minute time out feature.
To quickly exit OEM Softener Setup, OEM Filter Setup, Installer Display Settings, Diagnostic or Valve History press SET CLOCK.
Any changes made prior to the exit are incorporated.
When desired, all information in Diagnostics may be reset to zero when the valve is installed in a new location. To reset to
zero, press NEXT and simultaneously to go to the Service/OEM 1 screen, and release. Press and simultaneously to
reset diagnostic values to zero. Screen will return to User Display.
Sometimes it is desirable to have the valve initiate and complete two regenerations within 24 hours and then return to the preset
regeneration procedure. It is possible to do a double regeneration if the control valve is set to “NORMAL” or “NORMAL + on 0” in
Step 8S or Step 7F. To do a double regeneration:
1. Press REGEN once. REGEN TODAY will ash on the display.
2. Press and hold REGEN for three seconds until the valve regeneration initiates.
Once the valve has completed the immediate regeneration, the valve will regenerate one more time at the preset regeneration time.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Clack WS1CS and is the answer not in the manual?