MAN.234 Rev.6 ENG - Use and maintenance manual S19HD page 35 of 126
4.3 Transport, storage and pack-
aging
In order to load/unload the platform, it is possible to
use a travelling crane of adequate capacity, sling
the MEWP by the coupling on the chassis and on
outriggers (Picture 16).
Picture 16: hooks for sling and lifting.
The lifting operations must always be carried
out with the machine closed.
Be careful not to damage the machine.
Always use the needed personal protection
equipment; do not handle ropes or chains
without gloves.
The presence of people in proximity of
MEWP during the operations is forbidden.
Alternatively, the loading/unloading can be done
through ramp, exploiting the motricity of the ma-
chine as well as its ability to overcome slope ap-
proach angle lower than 31° (60%). If you choose
this option, please proceed with the following proce-
dure, and carefully reading the danger notes sug-
gested.
Comply with the rules in force about width,
height, weight and transport speed allowed.
Check that the limit gauge is compatible with
the features of the route to be made (i.e. gal-
leries, bridges, electrical and phone lines, etc.).