MAN.243 Rev.5 ENG - Use and maintenance manual S28 page 66 of 138
o screw turning clockwise by hand the aerial part
proportional valve APV (Picture 53) on the right
side of the main inlet group, to send oil to the
emergency control workbench (par. 3.3.2);
o screw turning clockwise by hand the levelling
valve LV (Picture 54) on the center of the main
inlet group.
First carry out the recovery operations of the
basket, to make the operator on board safe.
Picture 54: levelling valve on main inlet group.
At this point, the operator in the basket shall carry out the
emergency operations for leveling and rotation of the
basket:
o approaching, with a pointed object, to the cursors
in Picture 55, which are mirrored on both sides of
the jib support;
Picture 55: views on the left/right side of the
cursors bench for leveling and rotation.
following the scheme shown in the appropriate
decal applied on the jib support:
Left side
cursors
Right side
cursors
LV

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CMC S28 and is the answer not in the manual?

CMC S28 Specifications

General IconGeneral
BrandCMC
ModelS28
CategoryBoom Lifts
LanguageEnglish

Related product manuals