EasyManua.ls Logo

Coaire SCROLL CSOF-M3PL/H12 - Maintenance Schedule; Scheduled Maintenance (Low Pressure)

Coaire SCROLL CSOF-M3PL/H12
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
MAINTENANCE
8.0 Maintenance
○ : Check, repair  : Replace
Section
Action Taken Times Interval
Remarks
Criteria A
Every
day
2 month 1 year 2 years 4 years 8 years
Criteria B 1 month 6 month 1 years 2 years 4 years
Criteria C
0.5
month
3 month 6 month 1 years 2 years
Water Drain Drain out ○
Suction Filter Clean, Replace
○
(500hr)
exchange
in case
of pollution
Air end fan Clean ○ ○
Air end Bearing Clean ○
Air end grease Re-grease ○ ○ ○
Tip seal Replace ○
Dust seal Replace ○
Belt Check, Replace
○
(first)
○
Looseness
makes noise
Temp sensor Check operation ○
Replace case
of abnormal
Pressure Sensor Check operation ○
Replace case
of abnormal
Safety V/V Check operation ○
Check V/V
Check,
Replace
○
Ventilation fan Check ○ ○
Motor pulley Check groove ○
Motor
Check
insulation,
bearing
○
Suction hose Replace ○
After cooler Clean ○
Clean case of
abnormal
Control panel Check monitor ○
Piping Check leak ○
Air end Overhaul ○
8-1 Scheduled Maintenance – Low pressure 115 psi (Model : CSOF-M3,5PL/ CSOF-S8,10PL)
Maintenance should be followed below criteria A,B,C
■ Criteria A: Under 2,500 working hours (annually)
■ Criteria B: Between 2,500 ~ 5,000 working hours (annually)
■ Criteria C: Over 5,000 working hours (annually)
 NOTE
Maintenance schedule is instructed as above. The intervals are a guide based on normal operating
conditions. If operated in a severe environment, necessary maintenance service should be performed
on a more frequent basis. User should carry out the maintenance work, based on either the running
hours or the calendar time whichever comes first.