CommScope Instruction Guide
860647713, Rev B, V.05
Page 38
38 Pages
Figure 51. DC Load (Interconnect) Cable Connection to Power Cabinet
9. Turn up power:
a. Verify that power shelf controller recognizes thermal probes from battery cabinet.
■ Perform a probe failure alarm test from controller. If needed, refer to the manual provided with
the cabinet.
b. Verify that thermosiphon runs – if available.
c. Verify LED light switch operates.
d. Verify door, hi-temp thermostat (if available), and thermosiphon (if available) alarms are operable.