EasyManua.ls Logo

Conair 100 - Page 25

Conair 100
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation l 3-3
Unpacking the Boxes (continued)
4 Take a moment to record serial numbers and electrical power specifications
in the blanks provided on the back of the the User Guide’s title page. The infor-
mation will be helpful if you ever need service or parts.
5 You are now ready to begin installation.
Follow the preparation steps on the next page, then choose one of the four
mounting options:
• Dryer and hopper on the processing machine throat using the optional
support frame (see page 3-6).
• Dryer on the floor; hopper on the throat (see page 3-8).
• Dryer and hopper on a mobile floor stand (MDC mounting, see
Appendix B).
• Dryer on a floor stand; hopper on the throat (see Appendix B).
3
Description

Table of Contents